Construction Estimate Peer Reviews
Objective: Review contractor’s estimates from the conceptual level
to detailed estimating. Identifying potential hidden contingencies, overstatements
and duplications.
Material Cost Credits
Objective: Review documentation such as “Request for Information”
(RFI) and Submittals for potential material and method substitutions.
Often materials substitutions and alternate methods are indirectly approved
in this documentation without regard to potential cost credits.
Contractor Owned Equipment
Objective: Verify contractor owned equipment is being charged at rates
comparable to fair market value and the rates utilized are the most cost
effective with consideration of the rental duration.